![](https://adm.net.gr/wp-content/uploads/2020/03/FOLKLOR-MUSEUM-1.jpg)
SNFCC
STAVROS NIARCHOS FOUNDATION CULTURAL CENTER
Design and construction of two Prefabricated Substations, Main L.V. Switchboards, L.V. Distribution Panels, 2012 – 2016.
TAP
TRANS ADRIATIC PIPELINE
Design and construction of Main L.V. Switchboards and L.V. Distribution Panels, 2017-present.
PPC
PTOLEMAIDA UNIT V