Find2018-10-29T11:48:16+00:00

REFERENCES

ΤΑ ΕΡΓΑ ΜΑΣ


Warning: Cannot modify header information – headers already sent by (output started at /home/admnet/public_html/wp-content/themes/Avada/header.php:15) in /home/admnet/public_html/wp-content/plugins/insert-php/insert_php.php(89) : eval()’d code on line 2

Project
Project Description
Industry
Year
IONIA ODOS-MOTORWAYS
Design and Construction of Main LV Panels, Lighting and MCC Panels.
INFRASTRUCTURE PROJECTS
2016
MYKONOS PORT-PHASE B
Design and Construction of Main LV Panels, Lighting Pillars and Distribution Panels
INFRASTRUCTURE PROJECTS
2016
PTOLEMAIDA V
Design and construction of Worksite Pillars
PUBLIC POWER COMPANY
2016
DEPOT LEVEL MAINTENANCE COMPLEX TWO POSITION, C27J DEPOT LEVER MAINTENANCE HANGAR
Design and construction of MV panel, Main L.V. Switchboard and L.V. Distribution Panels
AIRPORTS
2015-2016
ERTG INSTALLATION BETWEEN PIER II & PIER III
Design and construction of Transformers, Main L.V. Switchboard, DC Panels & Distribution Pillars for lighting
INFRASTRUCTURE PROJECTS
2015
COCA COLA MOSCOW
Design and construction of LV Switchboard and Control Panels with PLC
WASTE & WASTE WATER TREATMENT PLANTS
2015
COCA COLA SAINT PETERSBURG
Design and construction of LV Switchboard and Control Panels with PLC
WASTE & WASTE WATER TREATMENT PLANTS
2015
Implementation of Phase II of the project “Integrated system of solid waste treatment facilities of Sofia Municipality – Design and Construction of a Mechanical–Biological Treatment (MBT) Plant for
Design and construction of Main LV Switchboards, Motor Control Centers, Low Voltage Distribution Panels. Supervision of the onsite installation.
WASTE & WASTE WATER TREATMENT PLANTS
2015
CENTRALE TURBINE A GAZ DE HASSI R’MEL
Design and construction of Fixed Type MCC (HVAC and EML panels) and Lighting panels
ENERGY PROJECTS
2014 up to 2016
ACCRA Ghana Airport
New Hydrant MCC Switchboard
AIRPORTS
2014
1

2 3 411 > >>